Kairos project moves ahead at Oak Ridge
July 18, 2025, 9:29AMNuclear News

The ETU 3.0 reactor vessel was lowered into position using construction cranes and mounted on a support structure attached to the building’s foundation. (Photo: Kairos Power)
A reactor vessel has been installed by Kairos Power for its third Engineering Test Unit (ETU 3.0) at the company’s campus in Oak Ridge, Tenn.
Tags:
Share: